AgentFixMajorSolar equipment

Strings now keep a confirmed orientation after two clear days

On plants where clear days are often curtailed, most strings used to end with only a partial result. Two clear days that agree are now enough for a confirmed orientation, instead of three. Plants receive this with their next agent update.

mirox-agents 3.1.112
AgentFixMajorSolar equipment

Strings get a result on days the inverters ran under a limit

Strings now get a result on days when the inverters ran under a power limit. Before, any limit below 100 percent made the check discard the whole day, so those days gave no result. Plants receive this with their next agent update.

mirox-agents 3.1.108 – 3.1.110
Web appImprovements and fixesSolar equipment

An analysis now fills in while it runs, instead of only once each of its days is finished.

  • While an analysis runs, the day being processed shows how many strings already have a result, not only once that day is finished.
  • The analysis summary now lists strings whose orientation could only partly be confirmed as a group of their own, apart from fitted and unassessable strings.
  • Pages and downloads from a device opened through remote access no longer stop part-way once the remote-access configuration is downloaded again.
  • Grey stretches now appear between a data logger's readings only where the logger really stopped reporting.
mirox 2.14.144 – 2.14.147
Read more in the documentationComponentsVPNData loggers
AgentImprovements and fixesSolar equipment

The on-site analysis now keeps the result of every string, even on a large plant.

  • After an on-site analysis on a large plant, every string keeps its result, where a few hundred of them previously went missing.
  • Changes to a plant's components take effect in the on-site analysis started right after, instead of up to an hour later.
  • Becker PV-Control data loggers can now be read by mapping the values they send.
mirox 2.14.144 – 2.14.147mirox-agents 3.1.108 – 3.1.110
Read more in the documentationComponentsData loggers
Web appImprovements and fixesSolar equipment

Strings can now be added to many inverters or combiner boxes in one step instead of one device at a time.

  • Strings can be added to several inverters or combiner boxes in one step, with all of a plant's inverters selected at once.
  • Editing a single string now opens with that string's current values already filled in.
  • If the connection to a data logger drops during its setup, "Reconnect" resumes it and keeps the step, credentials and value mapping.
  • On plants without combiner boxes, adding a string no longer asks where to attach it.
mirox 2.14.49 – 2.14.54
Read more in the documentationComponentsData loggers