Deleting a remote-access server or a connected site now asks for its name, and the warning states that its keys are gone for good.
A combiner box's figures open again instead of failing with an error.
A connected site that has been deleted no longer counts in the plant's remote-access status.
When plant documents are uploaded, the suggested installed capacity now covers every construction phase, and the grid operator and planning company are recognised more reliably.
A subnet typed but not added to the list now triggers a warning instead of the connected site being saved without it.
Times from late yesterday no longer show as today, and dates written in words now follow the calendar day.
A portfolio can no longer be deleted while plants are still assigned to it. A plant can now be deleted while it is running, but only once every data logger has been removed from it.
Action required: Organization admins: to delete a portfolio, first move its plants to another portfolio or delete the plants you no longer need, then delete the empty portfolio. To delete a single plant, remove its data loggers first; deactivating the plant is no longer required.
The monthly production chart now keeps a bar slot for every day of the selected range, leaving days without data empty.
A "Network scan" dialog now limits a scan to a subnet inside the plant's networks, and a device's type is picked from a fixed list.
A changed peak power, self-consumption, location or commissioning date now reaches a plant's on-site agent by itself, and the "Core Data" page shows the update.
The device search on a plant's "Networking" page now matches name, vendor, type, description, serial number, OS and MAC address as well as IP address.
The plant image is now shown in 4:3, and the upload dialog previews exactly how it will be cropped.
Adding an inverter or module type by hand no longer fails with an unexpected error.