Skip to content

June 2026

Changes released in June 2026.

Open in the full timeline

AgentFixMajorSolar equipment

Strings now keep a confirmed orientation after two clear days

On plants where clear days are often curtailed, most strings used to end with only a partial result. Two clear days that agree are now enough for a confirmed orientation, instead of three. Plants receive this with their next agent update.

mirox-agents 3.1.112
AgentFixMajorSolar equipment

Strings get a result on days the inverters ran under a limit

Strings now get a result on days when the inverters ran under a power limit. Before, any limit below 100 percent made the check discard the whole day, so those days gave no result. Plants receive this with their next agent update.

mirox-agents 3.1.108 – 3.1.110
Web appImprovements and fixesSolar equipment

An analysis now fills in while it runs, instead of only once each of its days is finished.

  • While an analysis runs, the day being processed shows how many strings already have a result, not only once that day is finished.
  • The analysis summary now lists strings whose orientation could only partly be confirmed as a group of their own, apart from fitted and unassessable strings.
  • Pages and downloads from a device opened through remote access no longer stop part-way once the remote-access configuration is downloaded again.
  • Grey stretches now appear between a data logger's readings only where the logger really stopped reporting.
mirox 2.14.144 – 2.14.147
Read more in the documentationComponentsVPNData loggers
AgentImprovements and fixesSolar equipment

The on-site analysis now keeps the result of every string, even on a large plant.

  • After an on-site analysis on a large plant, every string keeps its result, where a few hundred of them previously went missing.
  • Changes to a plant's components take effect in the on-site analysis started right after, instead of up to an hour later.
  • Becker PV-Control data loggers can now be read by mapping the values they send.
mirox 2.14.144 – 2.14.147mirox-agents 3.1.108 – 3.1.110
Read more in the documentationComponentsData loggers
Web appFeatureMajorSolar equipment

A plant's inverters can now be grouped into segments

The "Segments" tab of a plant's components page now groups its inverters into blocks, roofs or sub-parks, each with a name of its own. Each segment adds up the panel and inverter peak power of its inverters, unless a value is set by hand instead.

mirox 2.14.137 – 2.14.141
Web appFeatureMajorSolar equipment

Deep analysis picks its own days and runs in one press

"Deep Analysis" on a plant's components page now runs without a date or analysis mode to choose. It looks back over the last 90 days of weather, picks up to seven mostly clear days, and works out orientation, tilt and panel count for every string from them.

mirox 2.14.56
Read more in the documentationComponents
Web appFeatureSolar equipment

The string list now flags only the strings that need review

The string list now flags only the strings that need review: ones where neither configuration nor measurement says what is installed, ones where measurement contradicts configuration, and ones found disconnected. "Review" shows configured and measured values side by side, and "Mark as reviewed" clears a flag until the next analysis finds it again.

mirox 2.14.49 – 2.14.54
Read more in the documentationComponents
Web appImprovements and fixesSolar equipment

Strings can now be added to many inverters or combiner boxes in one step instead of one device at a time.

  • Strings can be added to several inverters or combiner boxes in one step, with all of a plant's inverters selected at once.
  • Editing a single string now opens with that string's current values already filled in.
  • If the connection to a data logger drops during its setup, "Reconnect" resumes it and keeps the step, credentials and value mapping.
  • On plants without combiner boxes, adding a string no longer asks where to attach it.
mirox 2.14.49 – 2.14.54
Read more in the documentationComponentsData loggers
Web appFeatureSolar equipment

Inverters can be edited in bulk and a component's datasheet opened

On a plant's components page, several inverters — or all inverters of the plant — can now be selected to assign their model datasheet or show hidden ones in one step. Where a datasheet is attached, the model name in the inverter, string and battery tables opens it.

mirox 2.14.38 – 2.14.48
Web appFeatureSolar equipment

Deep analysis shows its progress and can be aborted

A running deep analysis now shows each step, from production and weather data through strings, combiner boxes, inverters and feed-in meters, with the estimated time left. "Abort" stops it and keeps the results found so far, and at the start a "Clean re-analysis" can be chosen instead of the saved configuration.

mirox 2.14.18 – 2.14.25