A plant no longer appears offline while it catches up on a large backlog of older values.
With "Also monitor grid connection point" switched on, a Phoenix Contact controller now delivers the plant's feed-in power, reactive power and energy totals.
Plants with thousands of strings no longer stop delivering their string and combiner box values.
On plants that report sparsely, the figures worked out from irradiation readings no longer have gaps.
Plants with a Phoenix Contact controller now report their grid-operator and direct-marketer power limits, whichever integrator built the control cabinet.
An inverter whose peak power is entered as one figure is read again instead of being skipped.
The performance ratio measured against weather and satellite data shows again on plants where inverters, the feed-in meter or the irradiation sensor report only every few minutes. On those plants the figure had been missing since 2026-06-08. Plants receive this with their next agent update.
On plants with many strings and combiner boxes, the live figure for energy lost to a grid curtailment dropped to zero during a curtailment, reporting lost energy too low. It holds the measured value again. Plants receive this with their next agent update.
When a direct marketer curtailed only part of a plant, lost energy was counted twice, against the marketer and the grid operator. It now counts once, from that part's share of expected production, and the grid operator's figure drops. Plants receive this with their next agent update.
Flat-rate (pauschal) curtailment energy now counts only in the BDEW windows: 06:00–19:00 CET (07:00–20:00 in summer time) March to October, 09:00–16:45 CET November to February. Compensation changes with those figures. Plants receive this with their next agent update.
Larger SUN2000 inverters on a Huawei SmartLogger reported only their first 12 or 18 strings, leaving the rest without voltage or current. Every wired string is now monitored, whatever the model. Plants receive this with their next agent update.