Skip to content

July 2026

Changes released in July 2026.

Open in the full timeline

AgentImprovements and fixesAlerts & events

Plants no longer report a working network connection as offline.

  • An event about a plant's connection now says in words why it opened and what ended it.
  • On large plants, expected production no longer stalls or counts energy twice after the on-site agent restarts.
mirox-agents 3.1.145 – 3.1.147mirox 2.15.73 – 2.15.79
Read more in the documentationActivity
AgentImprovements and fixesAlerts & events

The on-site analysis now reports a string as defective, not an outage. Open string investigations now close after three days without usable data.

  • In the on-site analysis, a producing string below its neighbours on three sunny days is reported as defective.
  • A stuck reading no longer raises a "Measurement conflict" in the on-site analysis.
  • An event for a defective string names the inverter, combiner box and string it concerns.
  • A gradually failing meter no longer appears as an outage in the on-site analysis.
mirox-agents 3.1.140mirox 2.15.32 – 2.15.35
Read more in the documentationComponents