A wind plant's production state on the plant monitor is now computed from the sum of its turbines' power. It no longer reads unknown with a standing warning. Plants receive this with their next agent update.
In a plant's event list, a no-communication summary now collects silent inverters, combiner boxes, turbines and battery storage into one notification, announced in 20-minute batches. It closes when every component reports again. Plants receive this with their next agent update.
A wind plant's expected production is now computed per turbine from the plant's measured weather, each turbine's power curve and hub height, and the air density. Plants receive this with their next agent update.
An inverter can now be added as a data logger, reading its live output, energy, status and alarm codes, and backfilling its day curve from the inverter's web interface at 15-minute steps. Plants receive this with their next agent update.
A wind plant's SCADA can now be added as a data logger, reading each turbine's production, its stop commands with their cause, the grid operator or the direct marketer, and the grid operator's setpoint. Plants receive this with their next agent update.
A power quality analyzer can now be added as a feed-in meter and reads the grid, the PV feeder or the battery feeder. Plants receive this with their next agent update.