November 20261

Web appFeatureMajorSolar equipment

Transformer stations are now components of a solar plant

A solar plant's MV/LV transformer station is now a component. The plant's "Transformer stations" page shows each station's operating state, its condition, LV active power and oil temperature, with one curve per station. A "Transformers" tab on the components page and entries in events and tickets link to the station.

mirox 2.15.783 – 2.15.792

October 20261

Web appFeatureMajorSolar equipment

Trackers and plant controllers are now components of the plant

A solar plant's "Trackers" page shows its tracker field as control groups and individual trackers, with live state, a graph and batch editing. Where a plant has a plant controller, it shows under the graph on the "Trackers", battery dashboard, analysis and turbines pages.

mirox 2.15.696 – 2.15.703
Read more in the documentationSolar trackers

September 20261

Web appImprovements and fixesSolar equipment

The components and analysis pages can now be filtered by how many of an inverter's strings are verified.

  • Components tables now sort by model, serial number, peak power, combiner boxes and strings.
  • Sorting the components list by segment or peak power no longer blanks the counts in its Analysis column.
  • Opening the add-string dialog on the components page no longer blanks the page.
  • A past day opened from a week or month view no longer counts up as though it were today.
  • The analysis page's orientation filter is gone, and its station, inverter and combiner-box pickers now sit in their tables' column headers.
mirox 2.15.394 – 2.15.396
Read more in the documentationComponents

August 20262

Web appFeatureMajorSolar equipment

A replaced inverter can now be confirmed and keeps its history

A swapped inverter, listed twice because the data logger gave the new unit a new address, is now spotted as a pair and offered for confirmation on the components page. Once confirmed, the new inverter takes over the old one's configuration, the old unit is retired, and the graphs keep the earlier history.

mirox 2.15.330 – 2.15.339
Read more in the documentationComponents
Web appFeatureSolar equipment

String names can now be grouped by MPPT

With "Group string names by MPPT" switched on under a solar plant's "Component Naming" settings, its strings read "MPPT 2 – String 1" in the components list, a string's details, the analysis tables and tickets. Strings whose inverter does not report how many inputs each MPPT has keep their plain numbering.

mirox 2.15.235 – 2.15.242

July 20264

Web appFeatureSolar equipment

The analysis now shows strings and inverters per installed peak power

A plant's analysis now has a "Per kWp" switch that shows every value per installed peak power, in W/kWp and kWh/kWp, in the chart, bars, heatmap, table and legend. A small string then sits on the same scale as a large one.

mirox 2.15.104 – 2.15.125
Web appFeatureSolar equipment

The components page now lists components not physically present

The components page can now list the components a data logger keeps reporting although they produced nothing for 30 days, under "Probably not connected" in the "View" filter. An input with no string no longer counts as capacity in the on-site analysis, which compares each PV input against the others on the same inverter.

mirox 2.15.73 – 2.15.79
Web appFeatureMajorSolar equipment

Plant analysis now opens on a "Stations" tab

A plant's analysis now opens on a "Stations" tab, with one row per data logger showing whether it still reports and how many of its inverters are producing. A station opens to its inverters, combiner boxes and strings, and "Show sum of component" draws a whole level as one curve.

mirox 2.14.203 – 2.14.215

June 20268

Web appImprovements and fixesSolar equipment

An analysis now fills in while it runs, instead of only once each of its days is finished.

  • While an analysis runs, the day being processed shows how many strings already have a result, not only once that day is finished.
  • The analysis summary now lists strings whose orientation could only partly be confirmed as a group of their own, apart from fitted and unassessable strings.
  • Pages and downloads from a device opened through remote access no longer stop part-way once the remote-access configuration is downloaded again.
  • Grey stretches now appear between a data logger's readings only where the logger really stopped reporting.
mirox 2.14.144 – 2.14.147
Read more in the documentationComponentsVPNData loggers
Web appFeatureMajorSolar equipment

A plant's inverters can now be grouped into segments

The "Segments" tab of a plant's components page now groups its inverters into blocks, roofs or sub-parks, each with a name of its own. Each segment adds up the panel and inverter peak power of its inverters, unless a value is set by hand instead.

mirox 2.14.137 – 2.14.141
Web appFeatureMajorSolar equipment

Deep analysis picks its own days and runs in one press

"Deep Analysis" on a plant's components page now runs without a date or analysis mode to choose. It looks back over the last 90 days of weather, picks up to seven mostly clear days, and works out orientation, tilt and panel count for every string from them.

mirox 2.14.56
Read more in the documentationComponents
Web appFeatureSolar equipment

The string list now flags only the strings that need review

The string list now flags only the strings that need review: ones where neither configuration nor measurement says what is installed, ones where measurement contradicts configuration, and ones found disconnected. "Review" shows configured and measured values side by side, and "Mark as reviewed" clears a flag until the next analysis finds it again.

mirox 2.14.49 – 2.14.54
Read more in the documentationComponents
Web appImprovements and fixesSolar equipment

Strings can now be added to many inverters or combiner boxes in one step instead of one device at a time.

  • Strings can be added to several inverters or combiner boxes in one step, with all of a plant's inverters selected at once.
  • Editing a single string now opens with that string's current values already filled in.
  • If the connection to a data logger drops during its setup, "Reconnect" resumes it and keeps the step, credentials and value mapping.
  • On plants without combiner boxes, adding a string no longer asks where to attach it.
mirox 2.14.49 – 2.14.54
Read more in the documentationComponentsData loggers
Web appFeatureSolar equipment

Inverters can be edited in bulk and a component's datasheet opened

On a plant's components page, several inverters — or all inverters of the plant — can now be selected to assign their model datasheet or show hidden ones in one step. Where a datasheet is attached, the model name in the inverter, string and battery tables opens it.

mirox 2.14.38 – 2.14.48
Web appFeatureSolar equipment

Deep analysis shows its progress and can be aborted

A running deep analysis now shows each step, from production and weather data through strings, combiner boxes, inverters and feed-in meters, with the estimated time left. "Abort" stops it and keeps the results found so far, and at the start a "Clean re-analysis" can be chosen instead of the saved configuration.

mirox 2.14.18 – 2.14.25

January 20266