Your performance ratio is measured from your inverters' own output

Wherever every inverter your plant expects has reported, your performance ratio now comes from what those inverters produced, not from the feed-in meter. Losses in the meter and the lines no longer count against it. At a plant with battery storage the feed-in meter is never used. Your plants receive this with their next agent update.

  • Your performance ratio rises slightly at plants where the inverters' own sum is used.
  • A quarter-hour missing one expected inverter is still measured from the feed-in meter.
  • At a battery plant, a stretch the inverters cannot cover shows no value at all.
  • What a battery plant is expected to produce is no longer capped by its grid connection.
Shipped withmirox 2.15.376 – 2.15.393mirox-agents 3.1.435 – 3.1.442