Skip to content

July 2026

Changes released in July 2026.

Open in the full timeline

AgentFeatureCurtailment & grid limits

A plant now records a "Redispatch settlement" event per curtailment

For each grid-operator curtailment of a solar plant, the lost energy is now worked out under the binding BilAReM method and recorded as a "Redispatch settlement" event on the plant's "Activity" page, with the reference day chosen and the lost energy per irradiation source. Plants receive this with their next agent update.

mirox-agents 3.1.184 – 3.1.197mirox 2.15.111 – 2.15.125
Read more in the documentationMarket
AgentFixMajorCurtailment & grid limits

Live curtailment losses on large plants no longer drop to zero

On plants with many strings and combiner boxes, the live figure for energy lost to a grid curtailment dropped to zero during a curtailment, reporting lost energy too low. It holds the measured value again. Plants receive this with their next agent update.

mirox-agents 3.1.130
AgentFixMajorCurtailment & grid limits

Lost energy no longer counts for both the marketer and the grid

When a direct marketer curtailed only part of a plant, lost energy was counted twice, against the marketer and the grid operator. It now counts once, from that part's share of expected production, and the grid operator's figure drops. Plants receive this with their next agent update.

mirox-agents 3.1.127
AgentFixMajorCurtailment & grid limits

Flat-rate curtailment now counts only the BDEW clock windows

Flat-rate (pauschal) curtailment energy now counts only in the BDEW windows: 06:00–19:00 CET (07:00–20:00 in summer time) March to October, 09:00–16:45 CET November to February. Compensation changes with those figures. Plants receive this with their next agent update.

mirox 2.14.174 – 2.14.176mirox-agents 3.1.122