Skip to content

August 2026

Changes released in August 2026.

Open in the full timeline

AgentFeatureMajorCurtailment & grid limits

A Zebotec park controller now shows its power limits

A Zebotec PVPC park controller now shows the plant's active-power setpoints — the limit from the grid operator, the limit from the direct marketer, and the one the controller is acting on — each in percent of the plant's nameplate power. Plants receive this with their next agent update.

mirox-agents 3.1.250 – 3.1.256
AgentFeatureMajorCurtailment & grid limits

A Wattkraft Parkcontrol park controller now needs only its address

A Wattkraft Parkcontrol park controller is now read from its address alone, without a login, delivering the active-power setpoints of the grid operator and the direct marketer, which of them is in force, and whether the link to the direct marketer is up.

mirox-agents 3.1.243
AgentFeatureCurtailment & grid limits

Direct-marketer curtailments now get a "Marketer settlement" event

For each curtailment measure by the direct marketer, the lost energy is now recorded as a "Marketer settlement" event on the plant's "Activity" page, beside the "Redispatch settlement" events of grid-operator curtailments. The measure's own day can serve as its reference day, since only grid-operator curtailments disqualify a day. Plants receive this with their next agent update.

mirox 2.15.126 – 2.15.129
Read more in the documentationMarket