Skip to content

August 2026

Changes released in August 2026.

Open in the full timeline

Web appFeatureMajorSolar equipment

A replaced inverter can now be confirmed and keeps its history

A swapped inverter, listed twice because the data logger gave the new unit a new address, is now spotted as a pair and offered for confirmation on the components page. Once confirmed, the new inverter takes over the old one's configuration, the old unit is retired, and the graphs keep the earlier history.

mirox 2.15.330 – 2.15.339
Read more in the documentationComponents
Web appFeatureSolar equipment

String names can now be grouped by MPPT

With "Group string names by MPPT" switched on under a solar plant's "Component Naming" settings, its strings read "MPPT 2 – String 1" in the components list, a string's details, the analysis tables and tickets. Strings whose inverter does not report how many inputs each MPPT has keep their plain numbering.

mirox 2.15.235 – 2.15.242
AgentImprovements and fixesSolar equipment

The string analysis now runs by itself, once a week and every night through a plant's first 30 days.

  • An alert for a device that stopped sending data now closes once the device is back.
  • Expected values now come from a flat-mounted irradiation sensor where a plant has one, and per inverter orientation where a plant faces several directions.
  • At plants with many strings, the string analysis again measures a full 30 days, so a string that sent nothing reads as having no data.
mirox 2.15.235 – 2.15.242mirox-agents 3.1.314 – 3.1.320
AgentFixMajorSolar equipment

The string analysis now gives a result for nearly every string

The string analysis now gives nearly every string a result, measured on the plant's clearest days, instead of only a handful. Strings on combiner boxes that measure current per input are no longer reported as unmeasurable, and plants receive this with their next agent update.

mirox-agents 3.1.257
AgentImprovements and fixesSolar equipment

String analysis is available again at plants that run under a standing power limit.

  • At plants on sloping ground, the direction strings face is now worked out correctly instead of reading too far east.
  • At plants under a standing grid or marketer power limit, string analysis is available again instead of a whole day counted as curtailed.
mirox 2.15.176 – 2.15.184mirox-agents 3.1.250 – 3.1.256
AgentImprovements and fixesSolar equipment

The string analysis now runs in more situations: without a panel datasheet, on cloudy days, and where a string's orientation cannot be measured.

  • Without a panel datasheet the analysis still finds each string's wiring, connections and orientation, and only the peak power is missing.
  • A string whose own orientation cannot be measured now takes the orientation of its inverter, instead of being left out.
  • When there are too few clear days, cloudy days now help work out orientation, counting for less than a clear day.
  • A day when the plant stopped sending for an hour is still measured, instead of being set aside as overcast.
  • If no strings are set up for the inverters, the analysis now says so instead of failing with an error.
  • Expected production now follows the configured strings even when some lack a peak power or an orientation, instead of the plant's peak power alone.
mirox-agents 3.1.233 – 3.1.237
AgentImprovements and fixesSolar equipment

Huawei inverters now report their insulation resistance.

  • A combiner box now shows the serial number the on-site agent read from it.
  • The satellite irradiation figures in settlement events, which had stopped at 2026-07-31, update again on their own.
mirox-agents 3.1.220 – 3.1.226
Read more in the documentationMarket