November 2026

Changes released in November 2026.

Open in the full timeline

Web appFeatureMajorCurtailment & grid limits

The "Park control" tab shows grid and marketer power limits

On a solar plant's analysis page, the "Park control" tab now shows the grid operator's and the direct marketer's power limit per segment, in percent or watts, with a week or month line graph.

mirox 2.15.887
AgentFeatureMajorData collection

A plant controller can now be added as a data logger

A plant controller can now be added as a data logger, with the on-site agent reading the power, energy, operating state, string positions and fault codes of the plant's string inverters. Plants receive this with their next agent update.

mirox 2.15.875 – 2.15.881mirox-agents 3.2.258 – 3.2.264
Web appFeatureMajorSolar equipment

Transformer stations are now components of a solar plant

A solar plant's MV/LV transformer station is now a component. The plant's "Transformer stations" page shows each station's operating state, its condition, LV active power and oil temperature, with one curve per station. A "Transformers" tab on the components page and entries in events and tickets link to the station.

mirox 2.15.783 – 2.15.792