Skip to content

Changelog

Every change to Mirox, grouped by month. Filter by group or by kind of change.

Clear filters

October 20262

AgentFixMajorBattery storage

Battery setpoint no longer reads a flat zero

The battery setpoint figure read a flat zero even while the plant dispatched up to 10 MW. The setpoint figure now matches the plant's dispatch level. Plants receive this with their next agent update.

mirox-agents 3.2.175 – 3.2.176
AgentFixMajorBattery storage

Battery converter's stopped state and fault alarm now read correctly

A battery converter stopped by a protection previously read as unknown, counted as available, and raised no alarm. Its operating state now reads as stopped, its own fault alarm opens five minutes after the stop, and the plant's summary alarm opens fifteen minutes after the stop. Plants receive this with their next agent update.

mirox-agents 3.2.175 – 3.2.176

September 20264

AgentImprovements and fixesBattery storage

The direct marketer's battery setpoint is read from one more plant controller layout. A battery converter's voltages now read in volts, and the first data collection cycle at a battery plant finishes in seconds.

  • A battery storage power converter that reports voltages with no declared unit now reads them in volts.
  • The first data collection cycle at a battery plant no longer reads the cell tabs, so it finishes in seconds instead of a minute.
mirox-agents 3.2.128 – 3.2.130
Web appImprovements and fixesBattery storage

A ticket can now be raised on a battery container, rack, module or cell, and measurement exports and calendars reach back to 2020.

  • A ticket can now be raised on a battery container, rack, module or cell, and those tables show its open tickets.
  • Measurement exports now reach back to 2020, and every calendar has a year dropdown for picking an older day.
  • A site router that connects over IPsec without naming the identity it expects from Mirox is authenticated again instead of being refused.
  • A wind plant now has the same step-by-step setup page as a solar plant.
mirox 2.15.420 – 2.15.422
Read more in the documentationMetrics export APIDirect VPN
Web appFixMajorBattery storage

Battery cells now show only the temperatures the device measures

Linyang battery containers previously showed six temperature readings that no sensor takes, and modules 3 and 4 showed no temperature at all. Those readings have been removed, and cell temperatures are now filed under the right module.

mirox 2.15.394 – 2.15.396

August 20261

Web appImprovements and fixesBattery storage

Files of up to 200 MB can now be put into a plant's storage. Each battery container shows its racks, modules and cells, and each of those can be followed with its own curves.

  • Files of up to 200 MB can now be uploaded into a plant's storage.
  • A file over 50 MB is stored but not analysed automatically and reads "Too large to analyse (over 50 MB)".
  • Each battery container now shows how many racks, modules and cells sit below it, and how many of its cells are healthy.
  • A converter, rack, module or cell on a battery plant can now be picked and its own curves followed as a graph, heatmap or table.
  • A plant's contact list sorts and filters again when it holds entries with no personal name, such as the grid operator.
  • A battery component can no longer be marked as verified or given a note, as its details come from the battery system itself.
mirox 2.15.253 – 2.15.260
Read more in the documentationFile storage