October 20263

AgentFixMajorBattery storage

Battery setpoint no longer reads a flat zero

The battery setpoint figure read a flat zero even while the plant dispatched up to 10 MW. The setpoint figure now matches the plant's dispatch level. Plants receive this with their next agent update.

mirox-agents 3.2.175 – 3.2.176
AgentFixMajorBattery storage

Battery converter's stopped state and fault alarm now read correctly

A battery converter stopped by a protection previously read as unknown, counted as available, and raised no alarm. Its operating state now reads as stopped, its own fault alarm opens five minutes after the stop, and the plant's summary alarm opens fifteen minutes after the stop. Plants receive this with their next agent update.

mirox-agents 3.2.175 – 3.2.176

September 20267

AgentImprovements and fixesBattery storage

The direct marketer's battery setpoint is read from one more plant controller layout. A battery converter's voltages now read in volts, and the first data collection cycle at a battery plant finishes in seconds.

  • A battery storage power converter that reports voltages with no declared unit now reads them in volts.
  • The first data collection cycle at a battery plant no longer reads the cell tabs, so it finishes in seconds instead of a minute.
mirox-agents 3.2.128 – 3.2.130
AgentFeatureMajorBattery storage

A battery storage can now be added as a data logger

A battery storage can now be added as a data logger, and its converters, battery skids, and racks are then read with power, charge and discharge limits, state of charge, and the grid operator's limits on both charging and feed-in. Plants receive this with their next agent update.

mirox-agents 3.2.53 – 3.2.66mirox 2.15.457 – 2.15.467
Read more in the documentationData loggers
Web appFeatureMajorBattery storage

Battery plants now open on a "Production" page

A plant set up as a standalone battery plant now opens on "Production", showing what the storage exchanges with the grid and every storage unit in the plant. Where a feed-in meter reports, the page also shows grid power and today's export and import, and without one it shows the units alone.

mirox 2.15.443 – 2.15.446
Web appImprovements and fixesBattery storage

A ticket can now be raised on a battery container, rack, module or cell, and measurement exports and calendars reach back to 2020.

  • A ticket can now be raised on a battery container, rack, module or cell, and those tables show its open tickets.
  • Measurement exports now reach back to 2020, and every calendar has a year dropdown for picking an older day.
  • A site router that connects over IPsec without naming the identity it expects from Mirox is authenticated again instead of being refused.
  • A wind plant now has the same step-by-step setup page as a solar plant.
mirox 2.15.420 – 2.15.422
Read more in the documentationMetrics export APIDirect VPN
Web appFeatureBattery storage

The round-trip efficiency tile now follows the chosen range

The round-trip efficiency tile on the battery dashboard now follows the chosen range. The tile shows its own figure for windows of seven days or more, and the day view keeps the trailing week.

mirox 2.15.407 – 2.15.576
Web appFixMajorBattery storage

Battery cells now show only the temperatures the device measures

Linyang battery containers previously showed six temperature readings that no sensor takes, and modules 3 and 4 showed no temperature at all. Those readings have been removed, and cell temperatures are now filed under the right module.

mirox 2.15.394 – 2.15.396

August 20264

Web appFeatureBattery storage

A datasheet can now be assigned to many battery components at once

The components page now has a tab for each battery level — "PCS", "Box", "Storage", "Module" and "Cell" — with a checkbox on every row. "Edit Components" then sets or clears the datasheet for the ticked rows, for everything below the filtered parent, or for every component of that type.

mirox 2.15.253 – 2.15.260
Web appImprovements and fixesBattery storage

Files of up to 200 MB can now be put into a plant's storage. Each battery container shows its racks, modules and cells, and each of those can be followed with its own curves.

  • Files of up to 200 MB can now be uploaded into a plant's storage.
  • A file over 50 MB is stored but not analysed automatically and reads "Too large to analyse (over 50 MB)".
  • Each battery container now shows how many racks, modules and cells sit below it, and how many of its cells are healthy.
  • A converter, rack, module or cell on a battery plant can now be picked and its own curves followed as a graph, heatmap or table.
  • A plant's contact list sorts and filters again when it holds entries with no personal name, such as the grid operator.
  • A battery component can no longer be marked as verified or given a note, as its details come from the battery system itself.
mirox 2.15.253 – 2.15.260
Read more in the documentationFile storage
Web appFeatureMajorBattery storage

Battery plants now have an "Energy flow" page from converter to cell

Battery plants now have an "Energy flow" page. It shows live power through the converters and racks, state of charge, the voltage and temperature spread of the cells, a heatmap of every cell in a rack, and the same curves over a chosen period.

mirox 2.15.243 – 2.15.252
AgentFeatureMajorBattery storage

A FREQCON BESS FQ battery storage system can now be added as a logger

A FREQCON BESS FQ battery storage system can now be added to a plant as a data logger, and each cabinet's state of charge, DC power, charge and discharge energy, and cell voltages and temperatures are then read. Plants receive this with their next agent update.

mirox-agents 3.1.298 – 3.1.304mirox 2.15.214 – 2.15.224