Skip to content

Changelog

Every change to Mirox, grouped by month. Filter by group or by kind of change.

Clear filters

November 20262

AgentFixMajorSolar equipment

Detected capacity no longer reads above the nameplate

A plant's detected capacity no longer reads above its nameplate when a group of shaded strings at half current makes healthy single strings count as parallel rows. For affected plants the detected capacity moves down toward the nameplate. Plants receive this with their next agent update.

mirox-agents 3.2.266
AgentFixSolar equipment

The components page no longer marks a string as not connected

A string that produced no energy on one day but energy within the last 30 days is no longer marked as not connected. The not-connected mark now uses the same 30-day energy window as the "probably not connected" badge on the components page. Plants receive this with their next agent update.

mirox-agents 3.2.251 – 3.2.256

October 20262

September 20262

AgentFixSolar equipment

A dead voltage sense line now reads as missing, not zero production

A combiner box behind a data logger previously showed a measured 0 W while its strings carried real current. A missing channel now shows nothing, and an explicit zero still reads as zero. Plants receive this with their next agent update.

mirox-agents 3.2.102 – 3.2.112
Web appImprovements and fixesSolar equipment

The components and analysis pages can now be filtered by how many of an inverter's strings are verified.

  • Components tables now sort by model, serial number, peak power, combiner boxes and strings.
  • Sorting the components list by segment or peak power no longer blanks the counts in its Analysis column.
  • Opening the add-string dialog on the components page no longer blanks the page.
  • A past day opened from a week or month view no longer counts up as though it were today.
  • The analysis page's orientation filter is gone, and its station, inverter and combiner-box pickers now sit in their tables' column headers.
mirox 2.15.394 – 2.15.396
Read more in the documentationComponents

August 20266

AgentImprovements and fixesSolar equipment

The string analysis now runs by itself, once a week and every night through a plant's first 30 days.

  • An alert for a device that stopped sending data now closes once the device is back.
  • Expected values now come from a flat-mounted irradiation sensor where a plant has one, and per inverter orientation where a plant faces several directions.
  • At plants with many strings, the string analysis again measures a full 30 days, so a string that sent nothing reads as having no data.
mirox 2.15.235 – 2.15.242mirox-agents 3.1.314 – 3.1.320
AgentFixMajorSolar equipment

The string analysis now gives a result for nearly every string

The string analysis now gives nearly every string a result, measured on the plant's clearest days, instead of only a handful. Strings on combiner boxes that measure current per input are no longer reported as unmeasurable, and plants receive this with their next agent update.

mirox-agents 3.1.257
AgentImprovements and fixesSolar equipment

String analysis is available again at plants that run under a standing power limit.

  • At plants on sloping ground, the direction strings face is now worked out correctly instead of reading too far east.
  • At plants under a standing grid or marketer power limit, string analysis is available again instead of a whole day counted as curtailed.
mirox 2.15.176 – 2.15.184mirox-agents 3.1.250 – 3.1.256
AgentImprovements and fixesSolar equipment

The string analysis now runs in more situations: without a panel datasheet, on cloudy days, and where a string's orientation cannot be measured.

  • Without a panel datasheet the analysis still finds each string's wiring, connections and orientation, and only the peak power is missing.
  • A string whose own orientation cannot be measured now takes the orientation of its inverter, instead of being left out.
  • When there are too few clear days, cloudy days now help work out orientation, counting for less than a clear day.
  • A day when the plant stopped sending for an hour is still measured, instead of being set aside as overcast.
  • If no strings are set up for the inverters, the analysis now says so instead of failing with an error.
  • Expected production now follows the configured strings even when some lack a peak power or an orientation, instead of the plant's peak power alone.
mirox-agents 3.1.233 – 3.1.237
AgentImprovements and fixesSolar equipment

Huawei inverters now report their insulation resistance.

  • A combiner box now shows the serial number the on-site agent read from it.
  • The satellite irradiation figures in settlement events, which had stopped at 2026-07-31, update again on their own.
mirox-agents 3.1.220 – 3.1.226
Read more in the documentationMarket

July 20262

June 20266

May 20261

January 20267