Improvements and fixesAgentProduction & yield
Improvements and fixes
Lost energy for a failed inverter now covers all of its strings. Plants with several feed-in meters are now checked against the meters' combined output.
- Lost energy for a failed inverter now covers every string, including the ones that stopped sending data during the outage.
- On plants with more than one feed-in meter, a single meter is no longer measured against the output expected from the whole plant.
Shipped withmirox-agents 1.4.39