Skip to content
FixMajorAgent

Performance ratio corrected on plants with several feed-in meters

On a plant whose feed-in energy comes from more than one meter — including plants that publish their combined inverter power as the feed-in measurement — the performance ratio swung between implausible values. It is now calculated from a single summed feed-in energy figure. Your plants receive this with their next agent update.

  • Only the performance ratio used the affected counters; curtailment and forecast figures are unchanged.
  • On Fronius plants with a sensor card, the performance ratio now uses the plant's own irradiance sensor.
  • Plants with a single feed-in meter are unaffected.
Shipped withmirox-agents 3.1.61 – 3.1.65

June 2026