On a plant's "Market" tab, a PPA contract can now be assigned to the segment it covers instead of being given a typed power value. The contract takes that segment's panel peak power, a contract covering the whole plant stays on "Whole park", and the tab shows the total capacity assigned.
Expected production, and the maximum under a clear sky, no longer rise above a plant's "Grid Transmission Limit". A grid operator's percentage setpoint now counts against that limit, not the inverters' combined peak. Plants receive this with their next agent update.
On plants where clear days are often curtailed, most strings used to end with only a partial result. Two clear days that agree are now enough for a confirmed orientation, instead of three. Plants receive this with their next agent update.
Strings now get a result on days when the inverters ran under a power limit. Before, any limit below 100 percent made the check discard the whole day, so those days gave no result. Plants receive this with their next agent update.
While an analysis runs, the day being processed shows how many strings already have a result, not only once that day is finished.
The analysis summary now lists strings whose orientation could only partly be confirmed as a group of their own, apart from fitted and unassessable strings.
Pages and downloads from a device opened through remote access no longer stop part-way once the remote-access configuration is downloaded again.
Grey stretches now appear between a data logger's readings only where the logger really stopped reporting.
Days when the feed-in meter did not report, or reported an implausible value, no longer drop out of production figures. Production for those days is taken from the inverters instead.
The comparison of curtailment energy by settlement method in the API's revenue response previously depended on the data-quality filter and the plant's clipping setting. It now counts each method's booked curtailment energy alike, with inverter clipping considered.
The "Segments" tab of a plant's components page now groups its inverters into blocks, roofs or sub-parks, each with a name of its own. Each segment adds up the panel and inverter peak power of its inverters, unless a value is set by hand instead.
mirox 2.14.137 – 2.14.141
Web appImprovements and fixesNetwork & remote access
Until the official quarterly value is published, a running estimate of the Mischpreis (mixed price) used for settlement is calculated from the reBAP and AEP forecasts, covering about 1 month. The official value is recorded once it is published.
In Germany, curtailment by the direct marketer no longer counts during hours with a negative day-ahead price. Curtailment energy and the compensation calculated from it for those hours decrease. Plants receive this with their next agent update.
Where all grid meters are read through one QReader data logger, feed-in power behind curtailment losses and the performance ratio now sums every reporting meter instead of keeping only one. Curtailment losses decrease and the performance ratio rises, while figures already issued keep their value until a period is rebuilt. Plants receive this with their next agent update.
Battery storage now has its own page in the plant, showing state of charge, stored energy, usable capacity and the component count as figures, a time-series graph, and a real-time table of the battery components.
In a plant's report, the metrics can now be selected, and the resolution can be switched between daily, weekly and monthly. The report's table and bar chart show the selected metrics at the chosen resolution.
Changing a ticket comment, a plant's tariffs, its contracts or its devices now works only where the member's role allows it, while read-only access still opens them. Remote-access connections are listed only where the member's access covers them.
Curtailment energy under the flat-rate (pauschal) settlement method was too high because the night hours counted as well. It now covers only the energy lost while the sun was up, so those figures and the compensation based on them go down. Plants receive this with their next agent update.
A connected site added to a plant's remote access no longer asks for a tunnel address, which is now assigned. Connected sites that already exist keep their current address.
Action required: Organization admins and technicians who set up remote access: when you add a connected site, take its tunnel address from the configuration you download instead of choosing one, and use that address when you configure the remote router. Connected sites that already exist are untouched and keep their current address, so nothing has to be changed on routers that are already connected.
Deleting a remote-access server or a connected site now asks for its name, and the warning states that its keys are gone for good.
A combiner box's figures open again instead of failing with an error.
A connected site that has been deleted no longer counts in the plant's remote-access status.
When plant documents are uploaded, the suggested installed capacity now covers every construction phase, and the grid operator and planning company are recognised more reliably.
A subnet typed but not added to the list now triggers a warning instead of the connected site being saved without it.
Times from late yesterday no longer show as today, and dates written in words now follow the calendar day.
Saving any option in a plant's market settings no longer sets inverter clipping to be ignored. Since 1 June, plants where that happened showed too much curtailment energy and a compensation calculated from it that was too high as well.
Expected production and the five-day forecast now follow the direction and tilt each string actually has. Before, every string was assumed to face south at 15°, so plants built any other way saw figures that were off. Plants receive this with their next agent update.
A portfolio can no longer be deleted while plants are still assigned to it. A plant can now be deleted while it is running, but only once every data logger has been removed from it.
Action required: Organization admins: to delete a portfolio, first move its plants to another portfolio or delete the plants you no longer need, then delete the empty portfolio. To delete a single plant, remove its data loggers first; deactivating the plant is no longer required.
Curtailment on the dashboard and on a plant's production page is now the production the imposed limit forbids, attributed to the grid operator or the direct marketer and shown per settlement method. Figures from 1 June are calculated this way, while earlier periods keep the figures of the previous calculation and are marked "Legacy Data".
A "Forecast" page now lists a five-day production forecast for every visible plant, filtered by portfolio, searched by name and paged through as a list. Each day shows weather, temperature, wind and an energy figure, plus a power curve under the clear-sky ceiling.
Several connected sites can now be reached through one plant's remote access, with each site's subnets, keys and status managed on the "Peers" tab.
The production page is rebuilt: performance ratio per source, an inverter table, site specifications, and a day curve with the clear-sky ceiling and expected production.
Stretches where the plant could not be reached are now filled with the energy the weather model expects, shown as "Expected (no connection)".
The API now returns a plant's revenue and EEG compensation per month or year through GET /v1/park/{uid}/revenue, with Marktwert, Marktprämie and curtailment per settlement method.
The dashboard button again opens on the whole selected day, instead of on an empty range.
A plant's address is saved again when it is changed in the plant's details.
The performance ratio of a plant that measures feed-in energy with more than one meter no longer jumps between implausible values. It now adds up all those meters, including on plants that report combined inverter power as the feed-in measurement. Plants receive this with their next agent update.
mirox-agents 3.1.61 – 3.1.65
Web appImprovements and fixesNetwork & remote access
"Deep Analysis" on a plant's components page now runs without a date or analysis mode to choose. It looks back over the last 90 days of weather, picks up to seven mostly clear days, and works out orientation, tilt and panel count for every string from them.
The string list now flags only the strings that need review: ones where neither configuration nor measurement says what is installed, ones where measurement contradicts configuration, and ones found disconnected. "Review" shows configured and measured values side by side, and "Mark as reviewed" clears a flag until the next analysis finds it again.
The data logger wizard now sets up Fronius Datamanager and Datalogger devices, reading every inverter and an optional sensor card from the device itself.
On a plant's components page, several inverters — or all inverters of the plant — can now be selected to assign their model datasheet or show hidden ones in one step. Where a datasheet is attached, the model name in the inverter, string and battery tables opens it.
At a plant with more than one grid meter, the feed-in power behind curtailment losses and the performance ratio was previously neither the sum nor the average of the meters. It is now the sum of every meter reporting in that minute. Plants receive this with their next agent update.
Plant and organization storage now opens files of every category to technical and commercial managers, while accounting and contracts stay with commercial managers. Technical managers no longer reach the organization's AI overview or clearing its chat history, and members with view-only access no longer open a plant's files.
A WireGuard remote-access server created on a plant now has "Require a pre-shared key" on by default, and the connected site receives an extra generated key alongside its keypair, shown once right after creation. For an existing connection, "Include a pre-shared key" adds, renews or removes the key when its configuration is regenerated.
Starting a network scan on a plant's networking page now opens a dialog where "Scan range (optional)" limits the scan to part of the network and "Overwrite existing names" replaces device names with the latest analysis. Found devices appear in the table while the scan runs, filling in as they are identified.
A QReader data logger can now be set up by mapping its values. The "Map values" step lists every value the device sends for matching to a known measurement, and the "Dry run" step then shows which measurements the mapping produces before saving.
A running deep analysis now shows each step, from production and weather data through strings, combiner boxes, inverters and feed-in meters, with the estimated time left. "Abort" stops it and keeps the results found so far, and at the start a "Clean re-analysis" can be chosen instead of the saved configuration.
Curtailment losses are now calculated separately from the irradiation sensor, from satellite data and from weather data, with a live preview that follows a curtailment within minutes. A flat-rate method (Pauschalbilanzierung), the third German Redispatch 2.0 accounting method, holds the grid power measured before the curtailment as its reference. Plants receive this with their next agent update.
The monthly production chart now keeps a bar slot for every day of the selected range, leaving days without data empty.
A "Network scan" dialog now limits a scan to a subnet inside the plant's networks, and a device's type is picked from a fixed list.
A changed peak power, self-consumption, location or commissioning date now reaches a plant's on-site agent by itself, and the "Core Data" page shows the update.
The device search on a plant's "Networking" page now matches name, vendor, type, description, serial number, OS and MAC address as well as IP address.
The plant image is now shown in 4:3, and the upload dialog previews exactly how it will be cropped.
Adding an inverter or module type by hand no longer fails with an unexpected error.