A limit matching the grid connection no longer counts as curtailment
Curtailed energy and the compensation shown against it now fall at plants whose grid connection is smaller than their inverters. A limit from the direct marketer that merely restates full output was counted as curtailment all day long and is now judged against the smallest of panel peak, inverter rating and grid connection.
- The day graph, the analysis graph and the monitor's live column now judge a limit the same way.
- Flat-rate settlements change too, wherever the reference power had come from those limited minutes.
Shipped withmirox 2.15.367 – 2.15.375