For each grid-operator curtailment of a solar plant, the lost energy is now worked out under the binding BilAReM method and recorded as a "Redispatch settlement" event on the plant's "Activity" page, with the reference day chosen and the lost energy per irradiation source. Plants receive this with their next agent update.
A plant no longer appears offline while it catches up on a large backlog of older values.
With "Also monitor grid connection point" switched on, a Phoenix Contact controller now delivers the plant's feed-in power, reactive power and energy totals.
Plants with thousands of strings no longer stop delivering their string and combiner box values.
On plants that report sparsely, the figures worked out from irradiation readings no longer have gaps.
Plants with a Phoenix Contact controller now report their grid-operator and direct-marketer power limits, whichever integrator built the control cabinet.
An inverter whose peak power is entered as one figure is read again instead of being skipped.
The performance ratio measured against weather and satellite data shows again on plants where inverters, the feed-in meter or the irradiation sensor report only every few minutes. On those plants the figure had been missing since 2026-06-08. Plants receive this with their next agent update.
When a plant's network, its remote access or one of its network devices stops answering, the plant's "Activity" page now shows "Park network offline", "Network device offline", or "Network device mass outage" when many go at once. Each clears itself when the connection returns. Plants receive this with their next agent update.
Once a day, an inverter's energy is compared with the sum of its combiner boxes, and a combiner box's with the sum of its strings. A component that reads zero while the comparison shows it produced now shows "Measurement conflict" instead of "Outage". Plants receive this with their next agent update.
On plants with many strings and combiner boxes, the live figure for energy lost to a grid curtailment dropped to zero during a curtailment, reporting lost energy too low. It holds the measured value again. Plants receive this with their next agent update.
A string that produces nothing now raises a notice of its own. While the cause is still open it shows as "Investigation" and still counts as producing, becoming an "Outage" once the evidence confirms it or closing when shading explains it. Plants receive this with their next agent update.
When a direct marketer curtailed only part of a plant, lost energy was counted twice, against the marketer and the grid operator. It now counts once, from that part's share of expected production, and the grid operator's figure drops. Plants receive this with their next agent update.
The on-site agent now raises a "Component production outage" event on the "Activity" page when an inverter stops producing. The event appears after three five-minute windows with no output, only in daylight when snow, fog or curtailment does not explain it, and closes once production resumes. Plants receive this with their next agent update.
Flat-rate (pauschal) curtailment energy now counts only in the BDEW windows: 06:00–19:00 CET (07:00–20:00 in summer time) March to October, 09:00–16:45 CET November to February. Compensation changes with those figures. Plants receive this with their next agent update.
Larger SUN2000 inverters on a Huawei SmartLogger reported only their first 12 or 18 strings, leaving the rest without voltage or current. Every wired string is now monitored, whatever the model. Plants receive this with their next agent update.