Wherever every inverter a plant expects has reported, the performance ratio now comes from what those inverters produced, not from the feed-in meter. Losses in the meter and the lines no longer count against it. Plants receive this with their next agent update.
The performance ratio is no longer flattered at a plant whose grid meter cannot be reached. Minutes the plant spent held down at the grid operator's limit are now left out, even without a reading from that meter, instead of counting as clean production. Plants receive this with their next agent update.
The "Reduced output" flag no longer stays on a recovered component.
A device-reported thermal or insulation fault now confirms its event within 15 minutes, and a changed alarm count appears on the event within 30 minutes.
A string behind a data logger now reports its negative current when it back-feeds.
That quarter-hour's feed-in energy no longer drops from the Marktprämie after a restart inside a quarter-hour.
A Huawei SmartLogger with a LUNA2000 battery behind it now reports the whole storage: its converters, the container, its racks, packs and cells, with power, charge and discharge limits, state of charge and cell state of health. Plants receive this with their next agent update.
Alarms that NR Electric converters and Linyang battery containers raise about themselves now appear in the plant's event list, and an alarm closes again as soon as the device clears it. Each alarm shows how serious it is, and a Linyang alarm names the racks affected. Plants receive this with their next agent update.
A Phoenix Contact AXL controller can now be added as a data logger, reading every combiner box and string, the grid meter with its lifetime feed-in reading, and the irradiation and temperature sensors every 60 seconds. Plants receive this with their next agent update.
An Elsist SlimLine DLMS concentrator can now be added as a data logger, reading a Landis+Gyr feed-in meter through it: grid power plus the lifetime feed-in and consumption counters, at the meter's own resolution. Plants receive this with their next agent update.
An alert for a device that stopped sending data now closes once the device is back.
Expected values now come from a flat-mounted irradiation sensor where a plant has one, and per inverter orientation where a plant faces several directions.
At plants with many strings, the string analysis again measures a full 30 days, so a string that sent nothing reads as having no data.
A FREQCON BESS FQ battery storage system can now be added to a plant as a data logger, and each cabinet's state of charge, DC power, charge and discharge energy, and cell voltages and temperatures are then read. Plants receive this with their next agent update.
The expected-production curve read too low at plants whose output is capped, sitting well below the cap on bright days. It now follows the cap itself, and expected production on a bright day matches what the plant is allowed to deliver. Plants receive this with their next agent update.
A Solar-Log data logger can now be added like any other, with only its address and, where the logger has one, its user password, after which every inverter, meter and sensor it lists is read, whatever its make.
When a Solar-Log data logger or a Janitza meter is added, the devices behind it that are new to Mirox bring in the readings they still hold, up to two years back. This happens once, in the background, and plants receive it with their next agent update.
At Fronius plants, an inverter whose lifetime energy total stops advancing no longer lowers the plant's energy, its production being worked out from its power.
Adding or editing a data logger no longer causes another logger's Huawei or Sungrow inverters to appear as new components with their history split.
The string analysis now gives nearly every string a result, measured on the plant's clearest days, instead of only a handful. Strings on combiner boxes that measure current per input are no longer reported as unmeasurable, and plants receive this with their next agent update.
A Zebotec PVPC park controller now shows the plant's active-power setpoints — the limit from the grid operator, the limit from the direct marketer, and the one the controller is acting on — each in percent of the plant's nameplate power. Plants receive this with their next agent update.
A Wattkraft Parkcontrol park controller is now read from its address alone, without a login, delivering the active-power setpoints of the grid operator and the direct marketer, which of them is in force, and whether the link to the direct marketer is up.
A feed-in meter that reports power but keeps no energy counter now gets its lifetime feed-in energy added up from the plant's inverters. Plants receive this with their next agent update.
Huawei plants no longer show production dropping to zero when the data logger cannot reach an inverter. An unreachable inverter is now left out instead of being recorded as zero, and the plant's power is worked out from the inverters that did answer.
An irradiation sensor is now flagged when it reads zero while a neighbouring sensor or the plant's own production shows the sun is up. A confirmed defect also sends a notification.
An SMA Sunny Central plant can now be added with "SMA Sunny Central" as the data logger and the address of its SC-COM gateway, behind which its inverter, the string monitor control and every string monitor are found. Plants receive this with their next agent update.
In a "Redispatch settlement" event, the lost energy worked out by the flat-rate (pauschal) method previously counted quarter-hours the direct marketer had curtailed at the same time. For months from July 2026 the figure is net of that share and decreases where the two overlapped, while earlier months keep the gross figure. Plants receive this with their next agent update.
The performance ratio read too low at plants that were curtailed, and the expected production scaled from it was too low as well. Both are correct from this release, which plants receive with their next agent update. Plants receive this with their next agent update.
A plant that goes offline now raises one alert instead of two or none, and the alert closes only once the whole plant is reachable again. Alerts for devices that drop out in the same moment are held back, and plants receive this with their next agent update.
A Phoenix Contact controller now works out by itself which direction the grid meter counts, and shows no grid values until it is sure.
"Grid sign convention" in the controller's settings sets the direction by hand when the automatic check cannot decide.
Settlement events now also carry the lost energy worked out by the flat-rate (pauschal) method, beside the figures from each irradiation source.
Curtailments back to January 2025 are now settled, the reference day for months before July 2026 being the last suitable day before the curtailment.
A settlement event now names an irradiation source left out and why, and a morning gap in its readings no longer leaves the afternoon unsettled.
Expected production now follows each string's own orientation and size when the plant's components state them all, instead of one plant-wide orientation.
For each curtailment measure by the direct marketer, the lost energy is now recorded as a "Marketer settlement" event on the plant's "Activity" page, beside the "Redispatch settlement" events of grid-operator curtailments. The measure's own day can serve as its reference day, since only grid-operator curtailments disqualify a day. Plants receive this with their next agent update.