A wind plant's production state on the plant monitor is now computed from the sum of its turbines' power. It no longer reads unknown with a standing warning. Plants receive this with their next agent update.
A data logger that announced more devices than it delivered previously left the newest entry out of its list, so that device was never polled. The device list is now read whole, and a short list seen while running falls back to the logger's web interface. Plants receive this with their next agent update.
While a curtailment segment of a plant sat at a zero setpoint, the plant monitor previously marked its inverters as degraded. The inverters no longer open a degraded event. Plants receive this with their next agent update.
In a plant's event list, a no-communication summary now collects silent inverters, combiner boxes, turbines and battery storage into one notification, announced in 20-minute batches. It closes when every component reports again. Plants receive this with their next agent update.
The battery setpoint figure read a flat zero even while the plant dispatched up to 10 MW. The setpoint figure now matches the plant's dispatch level. Plants receive this with their next agent update.
A battery converter stopped by a protection previously read as unknown, counted as available, and raised no alarm. Its operating state now reads as stopped, its own fault alarm opens five minutes after the stop, and the plant's summary alarm opens fifteen minutes after the stop. Plants receive this with their next agent update.
A wind plant's expected production is now computed per turbine from the plant's measured weather, each turbine's power curve and hub height, and the air density. Plants receive this with their next agent update.
An inverter can now be added as a data logger, reading its live output, energy, status and alarm codes, and backfilling its day curve from the inverter's web interface at 15-minute steps. Plants receive this with their next agent update.
A curtailment settlement month is no longer finalized while satellite data is still missing. It is rebuilt once more if that data arrives up to 14 days after the month's deadline. Plants receive this with their next agent update.
Curtailment figures now include the plant controller's power cap and the direct marketer's active-power setpoint. The curtailment figure no longer reads too low where either ran. Plants receive this with their next agent update.
A faulted inverter's outage now opens at once, instead of five minutes after the inverter stopped, and closes once the inverter produces again. The plant's outage summary names the inverters still down and counts the ones producing again. Plants receive this with their next agent update.
The plant's outage register is now reported to the direct marketer, and declared maintenance or administrative outages reduce the flat-rate curtailment settlement. Compensation for a period with a declared outage goes down, and figures already issued keep their value. Plants receive this with their next agent update.
A wind plant's SCADA can now be added as a data logger, reading each turbine's production, its stop commands with their cause, the grid operator or the direct marketer, and the grid operator's setpoint. Plants receive this with their next agent update.
Curtailment settlement and lost energy no longer read too low for a period that started after a quiet stretch. The current and previous month are recalculated on the next run, and older months keep their value. Plants receive this with their next agent update.
A power quality analyzer can now be added as a feed-in meter and reads the grid, the PV feeder or the battery feeder. Plants receive this with their next agent update.