Expected production, and the maximum under a clear sky, no longer rise above a plant's "Grid Transmission Limit". A grid operator's percentage setpoint now counts against that limit, not the inverters' combined peak. Plants receive this with their next agent update.
On plants where clear days are often curtailed, most strings used to end with only a partial result. Two clear days that agree are now enough for a confirmed orientation, instead of three. Plants receive this with their next agent update.
Strings now get a result on days when the inverters ran under a power limit. Before, any limit below 100 percent made the check discard the whole day, so those days gave no result. Plants receive this with their next agent update.
In Germany, curtailment by the direct marketer no longer counts during hours with a negative day-ahead price. Curtailment energy and the compensation calculated from it for those hours decrease. Plants receive this with their next agent update.
Where all grid meters are read through one QReader data logger, feed-in power behind curtailment losses and the performance ratio now sums every reporting meter instead of keeping only one. Curtailment losses decrease and the performance ratio rises, while figures already issued keep their value until a period is rebuilt. Plants receive this with their next agent update.
Curtailment energy under the flat-rate (pauschal) settlement method was too high because the night hours counted as well. It now covers only the energy lost while the sun was up, so those figures and the compensation based on them go down. Plants receive this with their next agent update.
Expected production and the five-day forecast now follow the direction and tilt each string actually has. Before, every string was assumed to face south at 15°, so plants built any other way saw figures that were off. Plants receive this with their next agent update.
The performance ratio of a plant that measures feed-in energy with more than one meter no longer jumps between implausible values. It now adds up all those meters, including on plants that report combined inverter power as the feed-in measurement. Plants receive this with their next agent update.
At a plant with more than one grid meter, the feed-in power behind curtailment losses and the performance ratio was previously neither the sum nor the average of the meters. It is now the sum of every meter reporting in that minute. Plants receive this with their next agent update.