Expected production, and the maximum under a clear sky, no longer rise above a plant's "Grid Transmission Limit". A grid operator's percentage setpoint now counts against that limit, not the inverters' combined peak. Plants receive this with their next agent update.
Where all grid meters are read through one QReader data logger, feed-in power behind curtailment losses and the performance ratio now sums every reporting meter instead of keeping only one. Curtailment losses decrease and the performance ratio rises, while figures already issued keep their value until a period is rebuilt. Plants receive this with their next agent update.
Expected production and the five-day forecast now follow the direction and tilt each string actually has. Before, every string was assumed to face south at 15°, so plants built any other way saw figures that were off. Plants receive this with their next agent update.
The performance ratio of a plant that measures feed-in energy with more than one meter no longer jumps between implausible values. It now adds up all those meters, including on plants that report combined inverter power as the feed-in measurement. Plants receive this with their next agent update.
At a plant with more than one grid meter, the feed-in power behind curtailment losses and the performance ratio was previously neither the sum nor the average of the meters. It is now the sum of every meter reporting in that minute. Plants receive this with their next agent update.