Huawei plants no longer show production dropping to zero when the data logger cannot reach an inverter. An unreachable inverter is now left out instead of being recorded as zero, and the plant's power is worked out from the inverters that did answer.
A Phoenix Contact controller now works out by itself which direction the grid meter counts, and shows no grid values until it is sure.
"Grid sign convention" in the controller's settings sets the direction by hand when the automatic check cannot decide.
Settlement events now also carry the lost energy worked out by the flat-rate (pauschal) method, beside the figures from each irradiation source.
Curtailments back to January 2025 are now settled, the reference day for months before July 2026 being the last suitable day before the curtailment.
A settlement event now names an irradiation source left out and why, and a morning gap in its readings no longer leaves the afternoon unsettled.
Expected production now follows each string's own orientation and size when the plant's components state them all, instead of one plant-wide orientation.