Wherever every inverter a plant expects has reported, the performance ratio now comes from what those inverters produced, not from the feed-in meter. Losses in the meter and the lines no longer count against it. Plants receive this with their next agent update.
The performance ratio is no longer flattered at a plant whose grid meter cannot be reached. Minutes the plant spent held down at the grid operator's limit are now left out, even without a reading from that meter, instead of counting as clean production. Plants receive this with their next agent update.
The expected-production curve read too low at plants whose output is capped, sitting well below the cap on bright days. It now follows the cap itself, and expected production on a bright day matches what the plant is allowed to deliver. Plants receive this with their next agent update.
At Fronius plants, an inverter whose lifetime energy total stops advancing no longer lowers the plant's energy, its production being worked out from its power.
Adding or editing a data logger no longer causes another logger's Huawei or Sungrow inverters to appear as new components with their history split.
The performance ratio read too low at plants that were curtailed, and the expected production scaled from it was too low as well. Both are correct from this release, which plants receive with their next agent update. Plants receive this with their next agent update.