The limit a direct marketer states was shown twice, once against the plant controller's own rating. It is now a single figure against the plant's own setpoint, and the plant's curtailed energy is corrected. Plants receive this with their next agent update.
Curtailment and compensation shown close to live no longer show impossible values. A plant whose reference days all fail the plausibility check shows no close-to-live figure, and issued figures keep their value. Plants receive this with their next agent update.
A combiner box behind a data logger previously showed a measured 0 W while its strings carried real current. A missing channel now shows nothing, and an explicit zero still reads as zero. Plants receive this with their next agent update.
A closed outage previously named only the components that recovered last — 7 of 17 silent inverters — and now lists the whole incident. A device fault no longer reopens once the device has withdrawn every fault code, and no longer reads "Live" after an outage takes it over. Plants receive this with their next agent update.
Wind speed and wind gusts from the weather service were previously recorded in km/h under an m/s label, so the values shown read about 3.6 times too high. They are now recorded in m/s, and values recorded earlier keep the old figure.
Curtailment and compensation shown before the settlement at plants with battery storage now come from what the inverters produced, not from the feed-in meter behind the battery. They fall wherever the plant was charging or discharging while a limit was in force, and plants receive this with their next agent update. Plants receive this with their next agent update.
A plant no longer opens an "Inverter device fault" when its data logger reports it cannot read an inverter and no readings arrive. A low-priority "Logger cannot reach inverter" entry opens instead and becomes "Inverter not communicating" after an hour of daylight, and plants receive this with their next agent update.
A plant set up as a wind plant or a standalone battery plant is no longer measured as if it had panels: it no longer shows an expected-production curve, a clear-sky reference, a performance ratio or curtailment figures. Solar plants are unchanged, and plants receive this with their next agent update.
Curtailment losses previously read too high for any quarter-hour in which the on-site data collection paused: those minutes counted as zero production. Those minutes now count at the rate the measured minutes around them show, and lost energy and compensation fall for such quarter-hours.
A plant held at its grid operator's or direct marketer's limit now reads as producing, not "Grid Shutdown" or "External Shutdown". One long curtailment no longer fills the event list with dozens of entries.