Web appFeatureMajorCurtailment & grid limits

The "Park control" tab shows grid and marketer power limits

On a solar plant's analysis page, the "Park control" tab now shows the grid operator's and the direct marketer's power limit per segment, in percent or watts, with a week or month line graph.

mirox 2.15.887

September 20261

Web appFeatureMajorCurtailment & grid limits

A wind plant's "Turbines" page now shows curtailment losses by party

A wind plant's "Turbines" page now shows the energy lost to the grid operator, the direct marketer, environmental limits, stop commands and turbine faults. The losses are drawn as stacked areas on the day graph, as segments of the daily, weekly and monthly bars, and as a "Lost in total" figure.

mirox 2.15.468 – 2.15.483

August 20267

Web appFeatureMajorCurtailment & grid limits

The "Production" page now lists each settled curtailment

A "Curtailments" section on a plant's "Production" page now lists every settled curtailment and every live detection in the period shown, each with its window, its Ausfallarbeit, how it was settled and the compensation. The graphs now draw the same figures, so the last days of a period stay empty until the settlement has run.

mirox 2.15.274 – 2.15.278
Web appFeatureMajorCurtailment & grid limits

A plant's regulating signals now appear on a "Control Units" tab

A new "Control Units" tab on a plant's components page now lists the signals the plant is regulated by: the cap from the grid operator, the cap from the direct marketer, and the setpoint the plant controller applies. Each signal names the data logger reporting it and can be renamed, hidden or given a note.

mirox 2.15.261 – 2.15.273
Read more in the documentationComponents
Web appFeatureMajorCurtailment & grid limits

The monitor list now shows live power and the limits per plant

The monitor list now has a "Live" column showing the power each plant is feeding into the grid, refreshed every 10 seconds. Below it stand the plant's two power limits, from the grid operator and from the direct marketer, each coloured only while it is holding the plant back.

mirox 2.15.198 – 2.15.213
Web appFeatureMajorCurtailment & grid limits

A detected curtailment can now be excluded from the settlement

Curtailment episodes detected at a plant now appear in the plant's events as their own entries, with the limit that applied and the period covered. "Exclude from settlement" on an entry leaves it out of that month's curtailment figures, and "Re-include in settlement" puts it back.

mirox 2.15.198 – 2.15.213
AgentFeatureMajorCurtailment & grid limits

A Zebotec park controller now shows its power limits

A Zebotec PVPC park controller now shows the plant's active-power setpoints — the limit from the grid operator, the limit from the direct marketer, and the one the controller is acting on — each in percent of the plant's nameplate power. Plants receive this with their next agent update.

mirox-agents 3.1.250 – 3.1.256
AgentFeatureMajorCurtailment & grid limits

A Wattkraft Parkcontrol park controller now needs only its address

A Wattkraft Parkcontrol park controller is now read from its address alone, without a login, delivering the active-power setpoints of the grid operator and the direct marketer, which of them is in force, and whether the link to the direct marketer is up.

mirox-agents 3.1.243
AgentFeatureCurtailment & grid limits

Direct-marketer curtailments now get a "Marketer settlement" event

For each curtailment measure by the direct marketer, the lost energy is now recorded as a "Marketer settlement" event on the plant's "Activity" page, beside the "Redispatch settlement" events of grid-operator curtailments. The measure's own day can serve as its reference day, since only grid-operator curtailments disqualify a day. Plants receive this with their next agent update.

mirox 2.15.126 – 2.15.129
Read more in the documentationMarket

July 20261

AgentFeatureCurtailment & grid limits

A plant now records a "Redispatch settlement" event per curtailment

For each grid-operator curtailment of a solar plant, the lost energy is now worked out under the binding BilAReM method and recorded as a "Redispatch settlement" event on the plant's "Activity" page, with the reference day chosen and the lost energy per irradiation source. Plants receive this with their next agent update.

mirox-agents 3.1.184 – 3.1.197mirox 2.15.111 – 2.15.125
Read more in the documentationMarket

June 20261

AgentFeatureCurtailment & grid limits

Curtailment losses are now tracked per source and previewed live

Curtailment losses are now calculated separately from the irradiation sensor, from satellite data and from weather data, with a live preview that follows a curtailment within minutes. A flat-rate method (Pauschalbilanzierung), the third German Redispatch 2.0 accounting method, holds the grid power measured before the curtailment as its reference. Plants receive this with their next agent update.