Settlement months no longer finalize while satellite days are missing
A curtailment settlement month is no longer finalized while satellite data is still missing. It is rebuilt once more if that data arrives up to 14 days after the month's deadline. Plants receive this with their next agent update.
Curtailment figures now include the direct-marketer setpoint
Curtailment figures now include the plant controller's power cap and the direct marketer's active-power setpoint. The curtailment figure no longer reads too low where either ran. Plants receive this with their next agent update.
Curtailment settlement and lost energy no longer read too low
Curtailment settlement and lost energy no longer read too low for a period that started after a quiet stretch. The current and previous month are recalculated on the next run, and older months keep their value. Plants receive this with their next agent update.
September 20264
A direct marketer's limit now reads against the plant's own setpoint
The limit a direct marketer states was shown twice, once against the plant controller's own rating. It is now a single figure against the plant's own setpoint, and the plant's curtailed energy is corrected. Plants receive this with their next agent update.
Close-to-live curtailment no longer shows impossible values
Curtailment and compensation shown close to live no longer show impossible values. A plant whose reference days all fail the plausibility check shows no close-to-live figure, and issued figures keep their value. Plants receive this with their next agent update.
Close-to-live curtailment at battery plants no longer reads too high
Curtailment and compensation shown before the settlement at plants with battery storage now come from what the inverters produced, not from the feed-in meter behind the battery. They fall wherever the plant was charging or discharging while a limit was in force, and plants receive this with their next agent update. Plants receive this with their next agent update.
Lost energy no longer counts a pause in data collection as zero
Curtailment losses previously read too high for any quarter-hour in which the on-site data collection paused: those minutes counted as zero production. Those minutes now count at the rate the measured minutes around them show, and lost energy and compensation fall for such quarter-hours.
August 20262
Phoenix Contact Power Control Unit 4.0 controllers now report their limits, and a curtailed plant no longer raises underperformance alerts.
- A Phoenix Contact Power Control Unit 4.0 now reports the grid operator's and direct marketer's limits and the setpoints given to the battery.
- Inverters at a plant held down by the grid operator or the direct marketer are no longer reported as producing far below expectation.
- A day on which half of a plant's components fall below expectation no longer raises an underperformance event on each of them.
- A Phoenix Contact controller whose web interface has no login can now be added without one.
Flat-rate settlement now deducts the direct marketer's share
In a "Redispatch settlement" event, the lost energy worked out by the flat-rate (pauschal) method previously counted quarter-hours the direct marketer had curtailed at the same time. For months from July 2026 the figure is net of that share and decreases where the two overlapped, while earlier months keep the gross figure. Plants receive this with their next agent update.
July 20263
Live curtailment losses on large plants no longer drop to zero
On plants with many strings and combiner boxes, the live figure for energy lost to a grid curtailment dropped to zero during a curtailment, reporting lost energy too low. It holds the measured value again. Plants receive this with their next agent update.
Lost energy no longer counts for both the marketer and the grid
When a direct marketer curtailed only part of a plant, lost energy was counted twice, against the marketer and the grid operator. It now counts once, from that part's share of expected production, and the grid operator's figure drops. Plants receive this with their next agent update.
Flat-rate curtailment now counts only the BDEW clock windows
Flat-rate (pauschal) curtailment energy now counts only in the BDEW windows: 06:00–19:00 CET (07:00–20:00 in summer time) March to October, 09:00–16:45 CET November to February. Compensation changes with those figures. Plants receive this with their next agent update.