Expected production, and the maximum under a clear sky, no longer rise above a plant's "Grid Transmission Limit". A grid operator's percentage setpoint now counts against that limit, not the inverters' combined peak. Plants receive this with their next agent update.
Days when the feed-in meter did not report, or reported an implausible value, no longer drop out of production figures. Production for those days is taken from the inverters instead.
Where all grid meters are read through one QReader data logger, feed-in power behind curtailment losses and the performance ratio now sums every reporting meter instead of keeping only one. Curtailment losses decrease and the performance ratio rises, while figures already issued keep their value until a period is rebuilt. Plants receive this with their next agent update.
Expected production and the five-day forecast now follow the direction and tilt each string actually has. Before, every string was assumed to face south at 15°, so plants built any other way saw figures that were off. Plants receive this with their next agent update.
Several connected sites can now be reached through one plant's remote access, with each site's subnets, keys and status managed on the "Peers" tab.
The production page is rebuilt: performance ratio per source, an inverter table, site specifications, and a day curve with the clear-sky ceiling and expected production.
Stretches where the plant could not be reached are now filled with the energy the weather model expects, shown as "Expected (no connection)".
The API now returns a plant's revenue and EEG compensation per month or year through GET /v1/park/{uid}/revenue, with Marktwert, Marktprämie and curtailment per settlement method.
The dashboard button again opens on the whole selected day, instead of on an empty range.
A plant's address is saved again when it is changed in the plant's details.
The performance ratio of a plant that measures feed-in energy with more than one meter no longer jumps between implausible values. It now adds up all those meters, including on plants that report combined inverter power as the feed-in measurement. Plants receive this with their next agent update.
At a plant with more than one grid meter, the feed-in power behind curtailment losses and the performance ratio was previously neither the sum nor the average of the meters. It is now the sum of every meter reporting in that minute. Plants receive this with their next agent update.