A solar data logger's month-to-date yield previously counted the previous day's production again on the first day of a new month, inflating the lifetime energy sum. The repeated production is no longer published, and figures already issued keep their value. Plants receive this with their next agent update.
An event's lost energy no longer reads too low when the plant's loggers were down over the window. The estimate now uses satellite irradiation, scaled by the plant's own performance ratio over the week before.
A reading that briefly showed an energy counter at zero or a nonsense high value previously re-added the counter's total as new energy. Energy figures in graphs, reports, exports and the battery dashboard now cancel that reading against the next one, so the affected figures fall to what the plant actually produced.
Days that read tens of GWh too high or too low, after a turbine's history was read in again or after a turbine fell silent, now show what the turbines actually produced. The corrected figures appear in the day, week, month and year views and on the day power curve.
A plant set up as a wind plant or a standalone battery plant is no longer measured as if it had panels: it no longer shows an expected-production curve, a clear-sky reference, a performance ratio or curtailment figures. Solar plants are unchanged, and plants receive this with their next agent update.
Wherever every inverter a plant expects has reported, the performance ratio now comes from what those inverters produced, not from the feed-in meter. Losses in the meter and the lines no longer count against it. Plants receive this with their next agent update.
The performance ratio is no longer flattered at a plant whose grid meter cannot be reached. Minutes the plant spent held down at the grid operator's limit are now left out, even without a reading from that meter, instead of counting as clean production. Plants receive this with their next agent update.
A feed-in meter's own reading is used again on bright days, and the day counts as "measured" instead of "integrated". Before, a high reading was thrown out as impossible and replaced by the total added up from the inverters, or by zero where there was no substitute.
The expected-production curve read too low at plants whose output is capped, sitting well below the cap on bright days. It now follows the cap itself, and expected production on a bright day matches what the plant is allowed to deliver. Plants receive this with their next agent update.
At Fronius plants, an inverter whose lifetime energy total stops advancing no longer lowers the plant's energy, its production being worked out from its power.
Adding or editing a data logger no longer causes another logger's Huawei or Sungrow inverters to appear as new components with their history split.
A plant's expected monthly yield now allows for panel ageing counted from the day the plant was built, not from the day Mirox started collecting its data. Expected figures fall where the plant is older than its data, and no ageing is applied where no build date is recorded.
An inverter, a string or a combiner box opened from the analysis page showed its produced, expected and lost energy a thousand times too high — kWh labelled as MWh — and the battery overview showed DC power the same way. Both read correctly again.
The performance ratio read too low at plants that were curtailed, and the expected production scaled from it was too low as well. Both are correct from this release, which plants receive with their next agent update. Plants receive this with their next agent update.