Expected production, and the maximum under a clear sky, no longer rise above a plant's "Grid Transmission Limit". A grid operator's percentage setpoint now counts against that limit, not the inverters' combined peak. Plants receive this with their next agent update.
On plants where clear days are often curtailed, most strings used to end with only a partial result. Two clear days that agree are now enough for a confirmed orientation, instead of three. Plants receive this with their next agent update.
Strings now get a result on days when the inverters ran under a power limit. Before, any limit below 100 percent made the check discard the whole day, so those days gave no result. Plants receive this with their next agent update.
While an analysis runs, the day being processed shows how many strings already have a result, not only once that day is finished.
The analysis summary now lists strings whose orientation could only partly be confirmed as a group of their own, apart from fitted and unassessable strings.
Pages and downloads from a device opened through remote access no longer stop part-way once the remote-access configuration is downloaded again.
Grey stretches now appear between a data logger's readings only where the logger really stopped reporting.
Days when the feed-in meter did not report, or reported an implausible value, no longer drop out of production figures. Production for those days is taken from the inverters instead.
The comparison of curtailment energy by settlement method in the API's revenue response previously depended on the data-quality filter and the plant's clipping setting. It now counts each method's booked curtailment energy alike, with inverter clipping considered.
mirox 2.14.137 – 2.14.141
Web appImprovements and fixesNetwork & remote access
In Germany, curtailment by the direct marketer no longer counts during hours with a negative day-ahead price. Curtailment energy and the compensation calculated from it for those hours decrease. Plants receive this with their next agent update.
Where all grid meters are read through one QReader data logger, feed-in power behind curtailment losses and the performance ratio now sums every reporting meter instead of keeping only one. Curtailment losses decrease and the performance ratio rises, while figures already issued keep their value until a period is rebuilt. Plants receive this with their next agent update.
Curtailment energy under the flat-rate (pauschal) settlement method was too high because the night hours counted as well. It now covers only the energy lost while the sun was up, so those figures and the compensation based on them go down. Plants receive this with their next agent update.
Deleting a remote-access server or a connected site now asks for its name, and the warning states that its keys are gone for good.
A combiner box's figures open again instead of failing with an error.
A connected site that has been deleted no longer counts in the plant's remote-access status.
When plant documents are uploaded, the suggested installed capacity now covers every construction phase, and the grid operator and planning company are recognised more reliably.
A subnet typed but not added to the list now triggers a warning instead of the connected site being saved without it.
Times from late yesterday no longer show as today, and dates written in words now follow the calendar day.
Saving any option in a plant's market settings no longer sets inverter clipping to be ignored. Since 1 June, plants where that happened showed too much curtailment energy and a compensation calculated from it that was too high as well.
Expected production and the five-day forecast now follow the direction and tilt each string actually has. Before, every string was assumed to face south at 15°, so plants built any other way saw figures that were off. Plants receive this with their next agent update.
Curtailment on the dashboard and on a plant's production page is now the production the imposed limit forbids, attributed to the grid operator or the direct marketer and shown per settlement method. Figures from 1 June are calculated this way, while earlier periods keep the figures of the previous calculation and are marked "Legacy Data".
Several connected sites can now be reached through one plant's remote access, with each site's subnets, keys and status managed on the "Peers" tab.
The production page is rebuilt: performance ratio per source, an inverter table, site specifications, and a day curve with the clear-sky ceiling and expected production.
Stretches where the plant could not be reached are now filled with the energy the weather model expects, shown as "Expected (no connection)".
The API now returns a plant's revenue and EEG compensation per month or year through GET /v1/park/{uid}/revenue, with Marktwert, Marktprämie and curtailment per settlement method.
The dashboard button again opens on the whole selected day, instead of on an empty range.
A plant's address is saved again when it is changed in the plant's details.
The performance ratio of a plant that measures feed-in energy with more than one meter no longer jumps between implausible values. It now adds up all those meters, including on plants that report combined inverter power as the feed-in measurement. Plants receive this with their next agent update.
mirox-agents 3.1.61 – 3.1.65
Web appImprovements and fixesNetwork & remote access
At a plant with more than one grid meter, the feed-in power behind curtailment losses and the performance ratio was previously neither the sum nor the average of the meters. It is now the sum of every meter reporting in that minute. Plants receive this with their next agent update.
The monthly production chart now keeps a bar slot for every day of the selected range, leaving days without data empty.
A "Network scan" dialog now limits a scan to a subnet inside the plant's networks, and a device's type is picked from a fixed list.
A changed peak power, self-consumption, location or commissioning date now reaches a plant's on-site agent by itself, and the "Core Data" page shows the update.
The device search on a plant's "Networking" page now matches name, vendor, type, description, serial number, OS and MAC address as well as IP address.
The plant image is now shown in 4:3, and the upload dialog previews exactly how it will be cropped.