At plants with battery storage, curtailed energy and the compensation shown against it now come from what the inverters produced, and fall where they read too high. The feed-in meter sits behind the battery, so quarter-hours spent charging looked like no production at all and were claimed in full.
Curtailed energy and the compensation shown against it now fall at plants whose grid connection is smaller than their inverters. A limit from the direct marketer that merely restates full output was counted as curtailment all day long and is now judged against the smallest of panel peak, inverter rating and grid connection.
mirox 2.15.367 – 2.15.375
AgentImprovements and fixesCurtailment & grid limits
For plants settled on the flat-rate method, a curtailment is now measured against the power in the last valid period before it, rather than the highest power found earlier. Curtailed energy and compensation fall wherever the old rule lifted them, while figures already issued keep their value until a month is rebuilt.
Where the data a plant's settlement method needs has not been published yet, lost energy and compensation worked out a different way were shown as the plant's own. The row and its dialog now read "Satellite data not yet available" instead, or "No usable measurement data" where the gap is permanent.
Curtailment running into the night no longer counts energy from the irradiation sensor's night-time reading, a quarter-hour below 5 W/m² now counting as zero. Curtailed energy and the compensation shown against it fall at plants settled from measured irradiation, for instructions reaching into the evening or early morning.
A "Curtailments" section on a plant's "Production" page now lists every settled curtailment and every live detection in the period shown, each with its window, its Ausfallarbeit, how it was settled and the compensation. The graphs now draw the same figures, so the last days of a period stay empty until the settlement has run.
A new "Control Units" tab on a plant's components page now lists the signals the plant is regulated by: the cap from the grid operator, the cap from the direct marketer, and the setpoint the plant controller applies. Each signal names the data logger reporting it and can be renamed, hidden or given a note.
Curtailed energy and the compensation shown against it rise for periods before mid-May 2026: quarter-hours that carried no measurement now count, worked out from the plant's own irradiation sensors and feed-in meters. Plants settled on the flat-rate method get figures there for the first time.
A curtailment episode excluded with "Exclude from settlement" is now left out of the month's curtailed energy and compensation. Until this release the exclusion was recorded, but the month was settled as though nothing had been excluded.
A limit from the grid operator or the direct marketer left between 85 % and full power no longer counts as a curtailment, even where it does curtail. Curtailed energy and the compensation shown against it drop at plants whose limit sat in that band, at some for a whole month.
The monitor list now has a "Live" column showing the power each plant is feeding into the grid, refreshed every 10 seconds. Below it stand the plant's two power limits, from the grid operator and from the direct marketer, each coloured only while it is holding the plant back.
Curtailment episodes detected at a plant now appear in the plant's events as their own entries, with the limit that applied and the period covered. "Exclude from settlement" on an entry leaves it out of that month's curtailment figures, and "Re-include in settlement" puts it back.
A Zebotec PVPC park controller now shows the plant's active-power setpoints — the limit from the grid operator, the limit from the direct marketer, and the one the controller is acting on — each in percent of the plant's nameplate power. Plants receive this with their next agent update.
A Wattkraft Parkcontrol park controller is now read from its address alone, without a login, delivering the active-power setpoints of the grid operator and the direct marketer, which of them is in force, and whether the link to the direct marketer is up.
In a "Redispatch settlement" event, the lost energy worked out by the flat-rate (pauschal) method previously counted quarter-hours the direct marketer had curtailed at the same time. For months from July 2026 the figure is net of that share and decreases where the two overlapped, while earlier months keep the gross figure. Plants receive this with their next agent update.
For each curtailment measure by the direct marketer, the lost energy is now recorded as a "Marketer settlement" event on the plant's "Activity" page, beside the "Redispatch settlement" events of grid-operator curtailments. The measure's own day can serve as its reference day, since only grid-operator curtailments disqualify a day. Plants receive this with their next agent update.