The inverter limit now uses the sum of a plant's complete inverter datasheets when no manual value is set. The limit shows on the plant's power graph, forecast strip, alert text and outage-loss export, and the on-site agent clips at it.
A curtailment settlement month is no longer finalized while satellite data is still missing. It is rebuilt once more if that data arrives up to 14 days after the month's deadline. Plants receive this with their next agent update.
Curtailment figures now include the plant controller's power cap and the direct marketer's active-power setpoint. The curtailment figure no longer reads too low where either ran. Plants receive this with their next agent update.
Curtailment settlement and lost energy no longer read too low for a period that started after a quiet stretch. The current and previous month are recalculated on the next run, and older months keep their value. Plants receive this with their next agent update.
The raw curtailment columns of a wind plant settled as "Spitz Wind (power curve)", "Spitz Wind light (reference wind speed)" or "Pauschal Wind (flat rate)" no longer come back empty in exports. They now carry the value.
The limit a direct marketer states was shown twice, once against the plant controller's own rating. It is now a single figure against the plant's own setpoint, and the plant's curtailed energy is corrected. Plants receive this with their next agent update.
Curtailment and compensation shown close to live no longer show impossible values. A plant whose reference days all fail the plausibility check shows no close-to-live figure, and issued figures keep their value. Plants receive this with their next agent update.
The dashboard's curtailment chart and cards now show the same settled figures as a plant's production page, with quarter-hours not yet settled filled in close to live. Curtailment from before June 2026 is no longer shown on the dashboard because it came from an older calculation, while figures already issued keep their value.
Curtailment and compensation shown before the settlement at plants with battery storage now come from what the inverters produced, not from the feed-in meter behind the battery. They fall wherever the plant was charging or discharging while a limit was in force, and plants receive this with their next agent update. Plants receive this with their next agent update.
Curtailment losses previously read too high for any quarter-hour in which the on-site data collection paused: those minutes counted as zero production. Those minutes now count at the rate the measured minutes around them show, and lost energy and compensation fall for such quarter-hours.
At plants with battery storage, curtailed energy and the compensation shown against it now come from what the inverters produced, and fall where they read too high. The feed-in meter sits behind the battery, so quarter-hours spent charging looked like no production at all and were claimed in full.
Curtailed energy and the compensation shown against it now fall at plants whose grid connection is smaller than their inverters. A limit from the direct marketer that merely restates full output was counted as curtailment all day long and is now judged against the smallest of panel peak, inverter rating and grid connection.
mirox 2.15.367 – 2.15.375
AgentImprovements and fixesCurtailment & grid limits
For plants settled on the flat-rate method, a curtailment is now measured against the power in the last valid period before it, rather than the highest power found earlier. Curtailed energy and compensation fall wherever the old rule lifted them, while figures already issued keep their value until a month is rebuilt.
Where the data a plant's settlement method needs has not been published yet, lost energy and compensation worked out a different way were shown as the plant's own. The row and its dialog now read "Satellite data not yet available" instead, or "No usable measurement data" where the gap is permanent.
Curtailment running into the night no longer counts energy from the irradiation sensor's night-time reading, a quarter-hour below 5 W/m² now counting as zero. Curtailed energy and the compensation shown against it fall at plants settled from measured irradiation, for instructions reaching into the evening or early morning.
Curtailed energy and the compensation shown against it rise for periods before mid-May 2026: quarter-hours that carried no measurement now count, worked out from the plant's own irradiation sensors and feed-in meters. Plants settled on the flat-rate method get figures there for the first time.
A curtailment episode excluded with "Exclude from settlement" is now left out of the month's curtailed energy and compensation. Until this release the exclusion was recorded, but the month was settled as though nothing had been excluded.
A limit from the grid operator or the direct marketer left between 85 % and full power no longer counts as a curtailment, even where it does curtail. Curtailed energy and the compensation shown against it drop at plants whose limit sat in that band, at some for a whole month.
In a "Redispatch settlement" event, the lost energy worked out by the flat-rate (pauschal) method previously counted quarter-hours the direct marketer had curtailed at the same time. For months from July 2026 the figure is net of that share and decreases where the two overlapped, while earlier months keep the gross figure. Plants receive this with their next agent update.