At plants with battery storage, curtailed energy and the compensation shown against it now come from what the inverters produced, and fall where they read too high. The feed-in meter sits behind the battery, so quarter-hours spent charging looked like no production at all and were claimed in full.
Wherever every inverter a plant expects has reported, the performance ratio now comes from what those inverters produced, not from the feed-in meter. Losses in the meter and the lines no longer count against it. Plants receive this with their next agent update.
Curtailed energy and the compensation shown against it now fall at plants whose grid connection is smaller than their inverters. A limit from the direct marketer that merely restates full output was counted as curtailment all day long and is now judged against the smallest of panel peak, inverter rating and grid connection.
The performance ratio is no longer flattered at a plant whose grid meter cannot be reached. Minutes the plant spent held down at the grid operator's limit are now left out, even without a reading from that meter, instead of counting as clean production. Plants receive this with their next agent update.
The "Reduced output" flag no longer stays on a recovered component.
A device-reported thermal or insulation fault now confirms its event within 15 minutes, and a changed alarm count appears on the event within 30 minutes.
A string behind a data logger now reports its negative current when it back-feeds.
That quarter-hour's feed-in energy no longer drops from the Marktprämie after a restart inside a quarter-hour.
The revenue tables now show an "Energy (§ 51 applied)" column: the energy each band's Marktprämie is actually paid on. Each band's premium is now worked out from that energy instead of being shared across the bands by capacity.
mirox 2.15.330 – 2.15.339
Web appImprovements and fixesNetwork & remote access
The comparison of settlement methods on the revenue page now uses the figures from the monthly settlement. A month that has not been settled yet reads as unavailable instead of showing a number.
For plants settled on the flat-rate method, a curtailment is now measured against the power in the last valid period before it, rather than the highest power found earlier. Curtailed energy and compensation fall wherever the old rule lifted them, while figures already issued keep their value until a month is rebuilt.
Where the data a plant's settlement method needs has not been published yet, lost energy and compensation worked out a different way were shown as the plant's own. The row and its dialog now read "Satellite data not yet available" instead, or "No usable measurement data" where the gap is permanent.
A quarter-hour excluded from remuneration by § 51 EEG no longer shows a euro amount. The amount disappears when the month is recalculated, while the excluded energy stays in kWh.
Curtailment running into the night no longer counts energy from the irradiation sensor's night-time reading, a quarter-hour below 5 W/m² now counting as zero. Curtailed energy and the compensation shown against it fall at plants settled from measured irradiation, for instructions reaching into the evening or early morning.
Compensation for curtailed energy is now shown only for quarter-hours from 23 December 2025 on, the day that rule took effect. A compensation figure for a delivery month lying wholly before that date disappears the next time that month is settled.
Curtailed energy and the compensation shown against it rise for periods before mid-May 2026: quarter-hours that carried no measurement now count, worked out from the plant's own irradiation sensors and feed-in meters. Plants settled on the flat-rate method get figures there for the first time.
A curtailment episode excluded with "Exclude from settlement" is now left out of the month's curtailed energy and compensation. Until this release the exclusion was recorded, but the month was settled as though nothing had been excluded.
A limit from the grid operator or the direct marketer left between 85 % and full power no longer counts as a curtailment, even where it does curtail. Curtailed energy and the compensation shown against it drop at plants whose limit sat in that band, at some for a whole month.
An alert for a device that stopped sending data now closes once the device is back.
Expected values now come from a flat-mounted irradiation sensor where a plant has one, and per inverter orientation where a plant faces several directions.
At plants with many strings, the string analysis again measures a full 30 days, so a string that sent nothing reads as having no data.
A feed-in meter's own reading is used again on bright days, and the day counts as "measured" instead of "integrated". Before, a high reading was thrown out as impossible and replaced by the total added up from the inverters, or by zero where there was no substitute.
A plant's open-event count no longer adds the grouping alert on top of the dead components themselves: twelve dead inverters read as twelve.
Every event in a plant's activity list, dialogs and tickets now shows its name in the user's language instead of an untranslated one.
The month chart no longer marks a day as a connection outage when the plant produced right through a brief drop, or before monitoring began.
A Solar-Log logger can now be stopped, under its settings, from reporting a feed-in meter another source already reads, which counted grid power twice.
In the API, the site list can be narrowed by portfolio and type, both comma-separated, with the total and the paging following the filter.
The expected-production curve read too low at plants whose output is capped, sitting well below the cap on bright days. It now follows the cap itself, and expected production on a bright day matches what the plant is allowed to deliver. Plants receive this with their next agent update.
"Reachable subnets" now shows where two plants' networks overlap, not only where they are identical, and lets the plant serving the shared addresses be chosen.
On a per-Wp day graph, the reference curve now follows the selected components, so an east-west plant shows both of its peaks.
The sign-in page now states how long the pause after repeated failed sign-ins lasts, and that changing the password does not end it early.
Where two sources sent readings for the same minutes — after a restart, for example — a plant's curtailed energy for that quarter-hour was counted twice, and the compensation shown read too high. Such a quarter-hour is now left out of the settlement, and figures already issued keep their value.
At Fronius plants, an inverter whose lifetime energy total stops advancing no longer lowers the plant's energy, its production being worked out from its power.
Adding or editing a data logger no longer causes another logger's Huawei or Sungrow inverters to appear as new components with their history split.
The string analysis now gives nearly every string a result, measured on the plant's clearest days, instead of only a handful. Strings on combiner boxes that measure current per input are no longer reported as unmeasurable, and plants receive this with their next agent update.
A plant's expected monthly yield now allows for panel ageing counted from the day the plant was built, not from the day Mirox started collecting its data. Expected figures fall where the plant is older than its data, and no ageing is applied where no build date is recorded.
Compensation for curtailed energy is now priced against the official published value. Until that value is published, about two months after the delivery month, the figure stays an estimate and is corrected later.
Huawei plants no longer show production dropping to zero when the data logger cannot reach an inverter. An unreachable inverter is now left out instead of being recorded as zero, and the plant's power is worked out from the inverters that did answer.
An inverter, a string or a combiner box opened from the analysis page showed its produced, expected and lost energy a thousand times too high — kWh labelled as MWh — and the battery overview showed DC power the same way. Both read correctly again.
A field cleared in an organization or contact dialog now saves as empty, and an unchanged dialog saves nothing.
Through the API, /v1/sites now lists the reachable plants without health figures, and /v1/sites/status returns health for the plants named in the call.
A remote-access route whose subnet contains the reserved address 10.112.0.1 is now flagged, and only that single address stays unreachable inside the plant.
In a "Redispatch settlement" event, the lost energy worked out by the flat-rate (pauschal) method previously counted quarter-hours the direct marketer had curtailed at the same time. For months from July 2026 the figure is net of that share and decreases where the two overlapped, while earlier months keep the gross figure. Plants receive this with their next agent update.
The performance ratio read too low at plants that were curtailed, and the expected production scaled from it was too low as well. Both are correct from this release, which plants receive with their next agent update. Plants receive this with their next agent update.
A plant that goes offline now raises one alert instead of two or none, and the alert closes only once the whole plant is reachable again. Alerts for devices that drop out in the same moment are held back, and plants receive this with their next agent update.
A Phoenix Contact controller now works out by itself which direction the grid meter counts, and shows no grid values until it is sure.
"Grid sign convention" in the controller's settings sets the direction by hand when the automatic check cannot decide.
Settlement events now also carry the lost energy worked out by the flat-rate (pauschal) method, beside the figures from each irradiation source.
Curtailments back to January 2025 are now settled, the reference day for months before July 2026 being the last suitable day before the curtailment.
A settlement event now names an irradiation source left out and why, and a morning gap in its readings no longer leaves the afternoon unsettled.
Expected production now follows each string's own orientation and size when the plant's components state them all, instead of one plant-wide orientation.